ECOJOHN Logo  
1-866-ECOJOHN(326-5646)

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

WC Series      Toilet Waste Combustion System  

  Introduction
  Operation
  Gallery
  Technical Info
  Installation
  FAQ
  Download Brochure
INSTALLATION
The installation of the system can be done in a few easy steps.
The WC incinerators can be installed up to 10 feet from the toilet and 3 feet above the ground. The incinerator and waste tank must be placed within 10 feet from each other.
When the chimney system has been installed, connect the power supply (120V AC or 12VDC as an option for WC5) and the fuel source. The WC must be installed inside a weather proof building/structure. A minimum of 6 inches clearance from any outside wall is required.
Furthermore, it should not be operated in an area where there is a risk of an accumulation of flammable vapors or dust. The first step in the installation process is to install the chimney system - it can be installed vertically up through the roof or horizontally out through the wall. The pipe has a 6 inches I.D. and a 8 inches O.D.
Thereafter, the tanks and toilets need to be connected to make it a complete system (follow step-by-step instructions in the owner’s manual). Once all the pieces are connected, hook up the power and the system is ready to use.
COMPONENTS
INCLUDED CHIMNEY PARTS
• 8 ft Chimney Pipe  (6” double-wall)
• Flashing
• Storm Collar
• Roof Support
• Firestop
• Chimney Cap
OPTIONAL
• Catalytic converter
• Solar System

The catalytic converter filters the outgoing air and reduces outgoing particles.
 

next


Company  l  Sitemap  l  Privacy & Security  l  Contact Us  l  Send Feedback